Project experience
Electrical infrastructure work across the categories below, each carried across the full project lifecycle — scoping and design through construction administration and contractor RFIs.
All project experience shown was performed by Daniel as part of engineering firms that held the client contracts. Projects illustrate the type and caliber of work delivered; they are not contractual relationships of Government Infrastructure, and no engineering services are offered through this site.
Transportation
Roadway transportation infrastructure work scoped and designed through construction administration and contractor RFIs.
ITS
Intelligent transportation systems work — signalization, detection, and communications scope — carried from design through construction support.
Lighting
Lighting design work — roadway and site — from scoping and photometrics review through construction administration.
Substations
Substation electrical work performed across design and construction phases.
Secure facilities
Electrical work for secure facilities carried across the full project lifecycle.
Gas & water treatment plants
Electrical work for gas and water treatment plants, from scoping through construction support.
Industrial plants
Industrial plant electrical work performed as part of multi-discipline design teams.
CCTV
CCTV system work — camera siting, power, and communications scope — through design and construction phases.
LPR
License-plate-recognition system work carried through design and construction phases.
MVDS
Microwave vehicle detection system work scoped and designed through construction support.
School speed zones
School-speed-zone enforcement system work scoped and designed through construction administration.
Sporting arenas
Electrical and lighting work for tennis and soccer venues, from design through construction administration.
Pump stations
Irrigation and sanitary pump station electrical work carried across design and construction phases.
How far the work was carried
In each category above, the work ran the full arc of a project — not design handed off at 60%, but documents carried into the field:
- Scoping
- Design
- Construction administration
- Contractor RFIs
All project experience shown was performed by Daniel as part of engineering firms that held the client contracts. Projects illustrate the type and caliber of work delivered; they are not contractual relationships of Government Infrastructure, and no engineering services are offered through this site.